Integrated waste management project in Iași Municipality in accordance with the yellow FIDIC provisions (design and execution).
Integrated waste management project in Iași Municipality in accordance with the yellow FIDIC provisions (design and execution).
Feasibility study, Technical project, Award documents for the execution of 7 landfills and 15 bioremediation stations.
Project for supervising the implementation of the waste collection and treatment system in Galati Municipality.
Consultancy provided during the selection procedures of the contractor / contractors to whom the rehabilitation works, rehabilitation services supervision services, consultancy and Evaluation of the technical documentation related to the project will be entrusted.
Studies for environmental protection.
Studies for environmental protection.
Protection and rehabilitation of the Romanian coastal area and environmental factors, through engineering works to combat the phenomenon of coastal erosion; Supporting the tendency to revive the marine ecosystem and to develop some species lost at a given moment in the ecosystem; Protecting marine and coastal biodiversity.
Following the implementation of the project, the conservation status of species and habitats of community importance in the targeted areas has been improved and the level of awareness and information of local communities/authorities on the importance of biodiversity and natural heritage protection has been increased.
The works provide for the execution of new structures, rehabilitation / demolition / extension of existing ones, as well as artificial re-sanding of the beaches, all being designed to ensure stability for a period of 50 years.
The main objective is to depollute and improve the quality of soil and groundwater in the Titu-Boteni area by bringing the values of pollutants within normal limits (according to standards).