Design and preparation for the execution of 7 landfills and 15 bioremediation stations

Feasibility study, Technical project, Award documents for the execution of 7 landfills and 15 bioremediation stations.

The works that are the object of the project are:

  • Arrangement of 7 Landfills for treated soils;
  • Arrangement of 15 Bioremediation Stations for the treatment of oil-contaminated soil;
  • Principles underlying design:
  • Correct placement procedures
  • Dense and watertight asphalt surfaces – to withstand climatic conditions.
  • Surface water is collected and reused in the soil treatment process.
  • Collecting surface water in a watertight basin.
  • Sewage systems for collecting rainwater from the row storage area.
  • Proper access control, regular soil analysis.
  • The site is fenced to prevent access by unauthorized persons and animals.
  • Internal drainage and leachate collection system.
  • Perimeter channels related to the storage cell for rainwater collection.
  • Strict and periodic control procedures for monitoring trucks in the reception area
  • After filling, cover the stored soil with clean soil and plant vegetation to reduce infiltration. The project is realized through the collaboration of Romair Consulting and COWI A/S.
Name:
Design and preparation for the execution of 7 landfills and 15 bioremediation stations
Beneficiar:
PETROM S.A.
Services:
Feasibility study, Technical project, Award documentation
Funding source:
Private funds
Stage:
completed
Location:
Independent

ROMAIR CONSULTINGHeadquarters
4 Mr. Ștefan Sănătescu Str.,

District 1, Bucharest
GET IN TOUCHRomair on Social Media
ROMAIR CONSULTINGHeadquarters
4 Mr. Ștefan Sănătescu Str.,

District 1, Bucharest
OUR LOCATIONSWhere to find us?
GET IN TOUCHRomair on Social Media