The project involves the connection to the electricity network of a photovoltaic plant with an installed capacity of 3.47 MW, located in the Rediu area, Botoșani municipality.
- Name:
- Services for the realization of the technical project and the execution details, including technical assistance from the designer and consultancy for the execution period of the project “Photovoltaic power plant for the production of electricity from solar energy conversion, Botoșani municipality”
- Beneficiary:
- ALFA LAND
- Services:
- Alternative energy
- Duration:
- 3 months
- Funding source:
- Environmental Fund Administration: 40% of the eligible value of the project
- Stage:
- Completed
- Location:
- Botoșani Municipality