The project provides a road on four lanes, ie two in each direction, but also emergency lanes, from the entrance to the Resorts of Jupiter, Venus, Neptune and to the intersection with Dn 39 (Limanu Bridge - May 2).
The project provides a road on four lanes, ie two in each direction, but also emergency lanes, from the entrance to the Resorts of Jupiter, Venus, Neptune and to the intersection with Dn 39 (Limanu Bridge - May 2).
In the context of advancing the works on the Transylvania Highway and the heavy traffic traffic on the arteries that cross the municipality of Marghita, it was necessary to develop a Feasibility Study to analyze the need and opportunity to achieve a detour.
The city of Valea lui Mihai is located on DN 19 (E671), at the intersection with DN 19C and is subject to heavy transit traffic. As a result, it is necessary to develop a Feasibility Study to analyze the need and opportunity to achieve a bypass.
Modernization of the runway and the related movement surfaces at the “George Enescu” International Airport Bacău. The general objective of the contract, in accordance with the Large Infrastructure Operational Program 2014-2020 is an action designed to ensure the development of air transport infrastructure in Romania, directly contributing to the achievement of the objective of promoting sustainable transport in Romania, safely and efficiency, for people and goods, at the level of services at European standards.
Design and execution of the road concrete platform with wear layer, which will be calculated and dimensioned for the transit of aircraft and occasionally heavy machinery / equipment.
Romair Consulting performed the following consulting activities: Ensuring the management activities necessary for the implementation and completion of the project and for the CA to fulfill all obligations and conditions set out in the financing agreement, including risk management - identified problems, risks and inconsistencies, proposed solutions and recommendations.
The objective of the project is to create a route at the county road standard, in order to divert the transit traffic that currently crosses the center of Targu Jiu. The project is expected to increase traffic speeds from 30 to 50-80 km / h, provide better traffic conditions for vehicles, reduce pollution and the risk of accidents along the route that crosses the busy city center. , to reduce the maintenance cost for the city route and to encourage business development along it.
The development of the basic infrastructure in the Parâng mountain area which belongs to the Petroșani municipality in order to make it as attractive as possible for tourists. The project includes the rehabilitation of the access roads to the resort, the water supply, the construction of the sewerage system and the sewage treatment system in the resort.
The project is located in Timiș county, in order to rehabilitate a county road that starts from Sânnicolau Mare and reaches the county border with Arad. The objective of this project is to stimulate economic activity, better access for the population in the adjacent area, safer transport. The project proposes the rehabilitation of DJ 682 from the border of Arad county to Sânnicolau Mare, where it intersects with DN 6 (km 153 + 200). The proposed sector is 24 km long.
The project is located in Timiș County, on DJ 592 which connects Timișoara, Buziaș and Lugoj, 30 km from Timișoara. The project includes the rehabilitation of the total infrastructure, road structure, ditches and bridges along the road.